|
Detalhes do produto:
|
|
| Lugar de origem: | China |
|---|---|
| Marca: | Glawall |
| Certificação: | SGS, ISO 9001,UL, CE |
| Número do modelo: | Sem moldura |
|
Condições de Pagamento e Envio:
|
|
| Quantidade de ordem mínima: | 10 metros quadrados |
| Preço: | US$80.00 10 - 99 square meters |
| Detalhes da embalagem: | Pacote de madeira |
| Tempo de entrega: | 2-3 semanas |
| Termos de pagamento: | L/C, D/A, D/P, T/T, Western Union |
| Habilidade da fonte: | 3000 Square Meders por mês |
|
Informação detalhada |
|||
| Cola: | Não | Aplicativo: | Escritório, sala de conferências, etc. |
|---|---|---|---|
| Manutenção: | Fácil de limpar | Material da moldura: | alumínio |
| Método de instalação: | Montado na parede | Estilo de design: | Moderno |
| Isolamento acústico: | Alto | Transparência: | Claro |
Descrição de produto
![]()
Cured Panorama Full View Frameless/Framed Glass Wall Partition Office Glass Partition Wall
1. In modern office space design, glass partitions have become a core element for improving space utilization, especially when paired with aluminum alloy frames, achieving a unity of functionality and aesthetics.
2.Aluminum alloy itself is lightweight, sturdy, and corrosion-resistant, providing a stable and reliable structural support for glass partitions. Its various surface treatments, such as anodizing or powder coating, allow it to easily integrate into various office defferent styles.
3.Glass, as the panel material, with its high strength and safety performance after tempering, becomes an ideal choice for partitions. The most direct value of introducing glass partitions into office settings lies in the ability to flexibly divide space according to departmental divisions and functional needs, precisely defining open areas and private offices. This avoids the space wastage of traditional walls and maximizes the use of limited office space, perfectly adapting to diverse needs such as daily office work and meetings.
![]()
|
Install top tracks/ceiling brackets for the partition. |
|
Fix the wall starter at one end (securely attached to floor and wall). |
|
Connect top tracks/brackets to the ceiling (ensure levelness and stability). |
|
Install bottom tracks/brackets (aligned with top counterparts). |
|
Mount corner poles (for corner support and stability). |
|
Fit horizontal panels into tracks/brackets (maintain levelness and alignment). |
|
Install vertical panels between horizontal panels (ensure plumbness and alignment). |
|
Connect panels with connectors/clips to secure them in place. |
|
Adjust vertical poles for verticality and fix firmly. |
|
Align vertical poles with top/bottom grooves for panel installation. |
|
Connect horizontal/vertical panels using connectors/clips. |
|
Install blinds or other finishing elements to complete the setup. |
![]()
Welcome to our factory at any time!
Incorpore sua mensagem